New Twin Modular Operating Theatre with Laminar Flow
The Brief
To supply a new twin modular operating theatre with Laminar flow. To provide a full turn key project including all Architectural work including planning consent.

Time Scale
Order Date: May 2006
Site Delivery: July 2006
Operational: September 2006
The Solution
A pre engineered steel framed seven module unit was manufactured (ground and first floor plant room). The building was manufactured with top half clad in Aluminum panels to match the existing colours with the ground floor in a traditional render finish.
Final modular plantroom is put into place.